1) What Is an Open-Air Museum?

Museum area with archaeological remains, protection measures, and visitor infrastructure. Ephesus, Pergamon, Göreme are examples.

2) Design Principles

Protection first; minimum intervention, reversible structures, authentic materials, routes away from remains.

3) Visitor Route and Infrastructure

Walkways, platforms, information panels, facilities, security, disabled access.

4) Protection Structures

Mosaic covering, canopy, pergola, glass facade; enclosed sections where climate control needed.

5) Landscape

Native planting, drainage, lighting; landscape supports archaeological context.

6) Implementation

Master plan → detail design → board approval → phased execution → operation plan.

7) Operation and Sustainability

Ticket revenue, sponsorship, ministry and EU support; maintenance budget planning.

8) Conclusion

Well-designed open-air museums preserve heritage and create economic value. Contact us.