1) What Is Tile Restoration?

Removal, cleaning, fixing, and compatible completion of damaged or missing tiles; originals preserved where possible.

2) Damage Types and Causes

Mortar decay, moisture swelling, freeze-thaw, impact, wrong cleaning.

3) Restoration Process

Inventory → careful removal → cleaning → mortar → bonding → pointing → protection.

4) Mortar and Adhesive

Lime-based low-modulus mortars preferred; cement causes stress and breakage.

5) Missing Tile Completion

Technique and pattern analysis; distinguishable replacement tiles from workshops.

6) Ceramic vs Tile

Ceramic thicker and plain; tiles patterned and glazed; moisture barrier checked.

7) Protection and Maintenance

Hydrophobic treatment, regular inspection, drainage against frost.

8) Conclusion

Tile restoration requires specialist craft and material knowledge. Contact us.