1) What Is Earthquake Strengthening?

Upgrading existing structure (RC, masonry, timber) to meet seismic code via wrapping, shear walls, steel bracing, foundation upgrade.

2) When Is It Mandatory?

Class C and D risky building assessment triggers strengthening or demolition decision.

3) 2026 Regulatory Updates

Law 6306 process digitised; owners given deadline; demolition if not strengthened.

4) Strengthening Methods

RC: CFRP wrap, shear walls. Masonry: steel frame, injection, reinforced plaster.

5) Listed Buildings

Conservation board approval required; reversible, minimally visible interventions.

6) Project and Execution

Structural design → board approval → permit → execution → inspection → occupancy.

7) Cost and Support

Cost varies by building type; urban transformation support may apply.

8) Conclusion

Early assessment and professional design are critical. Contact us.