1) What Is an EPC?
Official document classifying annual heating, cooling, lighting, and hot water energy use from A (best) to G (worst) under Law 5627.
2) Who Must Obtain It?
New buildings, sold or rented residential and commercial properties, public buildings over 500 m².
3) How to Obtain
Calculated by certified energy expert using BEP-TR software; uploaded to ministry system.
4) What Classes Mean
Class A below 50 kWh/m²/year; Class G above 250 kWh/m²/year.
5) 2026 Updates
Minimum Class C extended for new buildings; sustainable design directly affects targets.
6) Design Optimisation
Insulation, glazing, heating system, sunshades set EPC class; calculate early.
7) Cost and Validity
Fee varies by size; valid 10 years; renew after major renovation.
8) Conclusion
EPC is both legal requirement and energy saving tool. Contact us.