1) What Is Conservation?
Conservation stabilises existing condition; restoration completes missing parts; both require scientific analysis.
2) Fresco Conservation
Moisture mapping, surface cleaning, consolidation, crack injection, retouching; plaster layer analysis.
3) Mosaic Conservation
Tessera loss, mortar decay, substrate cracks repaired with compatible materials.
4) Moisture Control
Moisture source eliminated before surface work; climate control and drainage prerequisite.
5) Scientific Analysis
Pigment, binder, IR/UV, microscopy support decisions.
6) Ethical Principles
Minimum intervention, reversibility, documentation, distinguishability.
7) Conservation Board
Listed building interventions require board approval and conservator report.
8) Conclusion
Multidisciplinary team required. Contact us.