1) What Is Stucco Work?

Plaster, stucco, wood and stone carving on walls, ceilings, facades; geometric and floral motifs.

2) Decoration Types

Plaster ceiling rosettes, stucco facades, wood ceilings, marble carving.

3) Damage Types

Cracks, loss, moisture swelling, darkened paint, woodworm, wrong repainting.

4) Restoration Process

Inventory → cleaning → consolidation → completion → surface finish.

5) Cleaning Techniques

Dry cleaning, gel cleaners, local damp cleaning; no acid or pressure water.

6) Missing Completion

Mould and hand carving; distinguishable from original; pattern analysis.

7) Material Compatibility

Lime-plaster mix, traditional binders; modern plaster may crack.

8) Conclusion

Requires master craftsmanship. Contact us.