1) What Are Zoning Parameters?

TAKS, KAKS/density, floor count, height, setbacks, green area ratio vary per parcel.

2) Density Calculation and Design

Density sets total buildable area; basement, balcony, terrace inclusion read from plan notes.

3) Setbacks and Placement

Front, rear, side garden distances limit building position on parcel.

4) Floor Count and Height

Hmax and floor count limits from zoning plan; roof and basement use per plan notes.

5) Permit Process

Permit and execution drawings must match exactly.

6) Design Tips

Obtain zoning status early; develop alternatives within density; check parking quota.

7) Common Mistakes

Design without reading plan notes, density exceedance, setback violation, unlicensed extra floor.

8) Conclusion

Zoning compliance is the legal foundation of any project. Contact us.