1) What Are the Project Stages?
Standard chain: concept/sketch → detailed design for permit → construction documents → detail drawings.
2) Concept Stage
Site analysis, brief, massing, and approximate cost. Client approval before detailed design. Revisions are cheapest here.
3) Detailed Design Stage
Permit-ready project compliant with zoning: plans, sections, elevations, facades, material specs. Coordinated with structural and MEP.
4) Construction Documents
Dimensioned drawings for contractors: door/window details, stairs, floors, special elements.
5) Permit and Approval
Detailed set submitted to municipality. Listed buildings need conservation approval first.
6) Site Coordination
Architect performs periodic site review; deviations need written approval.
7) Fee Distribution by Stage
Concept ~15–20%, detailed ~35–40%, construction docs ~40–45% of architectural fee. Clear brief early reduces cost.
8) Conclusion
Staged design improves quality and budget control. Define scope from the start.
Contact us about architectural design and construction services.