1) Map of the Tree

Ask: is fabric standing? Is the goal comfort, documented repair, or rebuilding the lost? How strong is the evidence?

2) Node A: Fabric and Listing

Check listing status first. Do not demolish traces before recording them.

3) Node B: Goal

Comfort points to renovation; heritage repair to restoration. Write one clear goal sentence before pricing.

4) Node C: Restitution

Restitution is evidenced reconstruction of form on paper, not automatic rebuilding on site.

5) Node D: Reconstruction Threshold

High evidence, written justification, and rejected gentler alternatives are required.

6) Owner–Architect Flow

Scan risks → write use/budget → mark tree nodes → survey package → permits → phased works. Leave stop/scale-down gates.

7) Common Mistakes

Calling PVC a restoration, inventing “original” forms, skipping survey, ignoring board time, comparing unlike scopes.

8) Conclusion

Use the tree to share one language. Contact us for restoration and advice.