1) Scope of VAT Exemption (3065/13-g)

Article 13/g can exempt deliveries and services for restoring Ministry-listed cultural assets. It is not automatic for every renovation. Works must be restoration in nature, with the required approvals. New-build-like additions may fall outside the exemption. Clear restoration line items on contracts and invoices matter in audits.

2) Core Conditions

Expect listing proof, conservation-board-approved survey and restoration projects, an official exemption or eligibility letter per current procedure, a contract defining restoration, and traceable progress billing. Mixing grant paperwork with tax files causes errors—grants are a separate track. Partial interventions need item-level clarity.

3) 100% Income/Corporate Deduction

Documented restoration spending on listed assets may be fully deductible from tax base under applicable rules. Furniture or weakly related décor may be excluded. Coordinate technical reports with your CPA early; a loss-making year can limit immediate benefit. Deduction lowers tax base—it is not a cash grant.

4) Application and Document Flow

Typical sequence: listing, survey/restoration design, board approval, tax/VAT eligibility correspondence, contract, invoices, accounting. Breaking the order risks taxable invoices that are costly to correct. e-Invoice descriptions should cite the legal basis and letter reference. Board revisions also shift the tax calendar.

5) Cost and Cash-Flow Impact

VAT exemption removes a large upfront cash burden on high-volume stone, timber, and strengthening works. The 100% deduction improves after-tax project return. Model gross versus net cost separately when comparing demolition-rebuild to restoration. Losing the exemption through bad invoices can erase the expected saving.

6) Limits and Audit Risk

Unlisted buildings, unpermitted works, or board-unapproved interventions do not qualify. Adaptive reuse with heavy new build may be only partly exempt. Keep bank-traceable payments and full archives. Exemption letters do not auto-transfer when the contractor changes.

7) Tips for Owners and Contractors

Verify listing status before site start. State VAT assumptions in tenders. Match progress-billing codes to restoration bills of quantities. Keep separate files per listed parcel. Photograph progress for both technical and tax files.

8) Conclusion

VAT exemption and full tax deduction reshape net restoration cost in 2026 when approvals and invoices are disciplined. Contact us for tax-aligned restoration project delivery and documentation coordination.