1) What Is Post-Restoration Interior Design?

Furniture, lighting, textiles after structural work; planned for adaptive use scenario.

2) Core Principles

Authentic volume and surfaces preserved; new elements reversible and distinguishable.

3) Colour and Materials

Palette compatible with historic surfaces; low-VOC materials.

4) Furniture and Built-ins

Period-compatible furniture; minimal removable built-ins; no wall/floor drilling.

5) Lighting

Concealed LED, spots; UV filter for historic surfaces.

6) Design by Function

Museum: display and information. Hotel: bed and bath integration. Residential: modern kitchen-bath in separate zone.

7) HVAC Integration

Climate control coordinated with interior service routes.

8) Conclusion

Correct interior design completes restoration and adds value. Contact us.