1) What Is Risky Building Assessment?
Evaluation of structural earthquake resistance under Law 6306, reported as risky or not risky.
2) Who Performs It?
Licensed organisations inspect on site and issue reports after owner application.
3) Evaluation Criteria
Structure type, age, storeys, soil class, damage history, and calculation results assessed together.
4) What Results Mean
Risky: demolition/rebuild or strengthening paths open. Not risky: continued use. Report submitted to authority.
5) Timeline and Cost
Report may take weeks; cost depends on size; paid by owner.
6) Appeal
Results can be appealed; second report from another licensed body possible.
7) Urban Transformation Link
Assessment is prerequisite for using transformation rights.
8) Conclusion
Reliable assessment is the foundation of the process. Contact us for consultancy.