1) What Is Sustainable Design?

Design approach minimising environmental impact across energy, water, materials, and waste.

2) Core Principles

Passive solar design, natural ventilation, high-performance insulation, renewables, local materials.

3) Energy Efficiency and EPC

Class A+ and above should be project targets under current regulations.

4) Material Selection

Low-carbon materials, recycled content, FSC timber, local supply, lifecycle analysis.

5) Water and Waste

Rainwater harvesting, greywater recovery, zero-waste site practices.

6) Green Certifications

LEED, BREEAM, and Turkish Green Building Certificate add credibility.

7) Cost and Payback

Initial cost may rise 5–15%; energy savings recover investment in 5–10 years.

8) Conclusion

Sustainable design is now a requirement, not a luxury. Contact us.