1) What Is Basement-Foundation Restoration?
Restoration of structure, moisture barrier, drainage, and floor finishes at foundation level; completed before upper work.
2) Moisture Sources
Rising damp, rainwater ingress, groundwater, condensation, pipe leaks; mapped with sensors.
3) Structural Damage
Foundation cracks, stone/brick delamination, concrete corrosion, timber pile decay.
4) Drainage and Barrier
Perimeter drainage, French drain, vapour barrier, ventilation; source eliminated first.
5) Application Steps
Excavation → foundation repair → drainage → barrier → wall consolidation → flooring.
6) Material Selection
Breathable lime mortar, natural stone; plastic barriers only with correct detail.
7) Monitoring
Long-term moisture sensors; drain and gutter maintenance.
8) Conclusion
Basement restoration is prerequisite for upper building protection. Contact us.