1) Conservation and Comfort

Conservation-first; modern comfort via minimum reversible intervention.

2) Material Selection

Original floors, ceilings, walls preserved; new materials in compatible tone and texture.

3) Lighting Design

Natural light preserved; concealed artificial lighting; UV filter for historic surfaces.

4) Function and Adaptive Use

Museum, hotel, office, residential conversion respects original volumes; partitions reversible.

5) Accessibility

Ramps, lifts, toilets; minimise visible intervention in listed buildings.

6) Flooring

Floor restoration is foundation of interior work; original flooring preserved where possible.

7) Project Process

Inventory → concept → detail design → board approval → execution.

8) Conclusion

Correct interior restoration keeps buildings alive and adds value. Contact us.