1) Definition

Registration places the property under cultural heritage law. Free alteration of structure, facade or plan is not allowed. Listing does not force museum use—continued occupation with approved change is normal.

2) Listing, Site, Conservation Plan

Ask three questions: individually listed? inside a conservation site? what do the plan notes say? Unlisted buildings in sites can still be constrained.

3) Owner Rights

Sell, let and inherit remain possible. Adaptive reuse can be approved. Grants or fee relief may exist under current rules—not automatic. Choose a competent design team.

4) Owner Duties

Maintain the asset; do not abandon it. Commission survey and restoration projects for major works. Unauthorised work risks stop orders and reinstatement.

5) What Needs Permission

Facade joinery, roof form, extra floors, cutting bays and structural openings typically need approval. Reconstruction is exceptional—see our restoration vs reconstruction note.

6) Process Pointer

Status check → survey → projects → board → municipal permit → documented works. Details stay in the permit guide; early advice avoids illegal “renovation” starts.

7) Myths

No title annotation does not always mean unrestricted. Interiors can be protected. A neighbour’s illegal work is not a precedent. Listing is a framework, not only a barrier.

8) Conclusion

Know the status, then plan lawful change. Contact us; see also the permit guide.