Home About Us Our Services References Why Us Our Projects FAQ Blog Contact

Beykoz Historic Ahmet Ferit İnal Pavilion Survey, Restitution and Restoration

Cultural Heritage – Survey, Restitution and Restoration Projects

Project Summary

Survey, restitution and restoration projects for the Historic Ahmet Ferit İnal Pavilion in Beykoz were prepared by Bike Architecture. The work covers documentation of the existing state of the structure and the design of architectural decisions for its conservation.

In the survey phase, the existing mass of the structure, facade layout, floor organisation and openings were examined on site; existing state drawings were produced through measurements and photographs. Timber facade cladding, window and shutter details and roof eaves were transferred to the survey drawings.

In the restitution studies, assessments regarding the past state of the structure were made on the basis of existing structural traces and facade layout; mass proportions, facade elements and opening arrangement were addressed in the restitution projects. Data relating to the original architectural character of the structure were reflected in the drawings at this stage.

In the restoration projects, architectural interventions for the conservation of the structure were defined; timber facades, joinery and roof elements were designed in line with restoration decisions. A holistic approach was adopted taking into account the relationship of the structure with its surroundings and its current position.

The project was created by Bike Architecture as a comprehensive project set covering the survey, restitution and restoration phases prepared for the Historic Ahmet Ferit İnal Pavilion in Beykoz.

Questions about this project? Get in touch

← Back to Restoration Projects