Project Summary
Survey, restitution and restoration projects for Çiçek Apartmanı (Flower Apartments) in Beyoğlu were prepared by Bike Architecture. The project covers the documentation of the existing state of the building, the conservation of its facade and plan characteristics, and the design of restoration decisions.
In the survey phase, the facade layout, floor organisation, load-bearing system and stairwell of the apartment building were measured on site and existing state drawings were prepared. The opening pattern on the facade, floor cornices and street-facing architectural character were transferred to the survey sheets. In the restitution studies, the original plan layout and period features were evaluated; in the restoration projects, the aim was to conserve the building's historic character, facade integrity and material continuity.
The project is a restoration study conducted by Bike Architecture for the conservation and perpetuation of Beyoğlu's apartment heritage.
Images


Questions about this project? Get in touch
← Back to Restoration Projects