1) From Old Palace to Serasker
The wooden Old Palace (completed 1458) occupied the site. After 1826 it housed Bab-ı Seraskerî; the wooden Serasker building was demolished in 1864 for today’s monumental structure.
2) Bourgeois and the War Ministry
Three storeys around a central garden, calm symmetrical facades and rich interiors. From 1879 it served as the Ottoman War Ministry.
3) Darülfünun to İÜ (1933)
After 1923 ministries moved to Ankara and the building went to Darülfünun; on 1 August 1933 it became Istanbul University—shell retained, institution changed.
4) Blue and Pink Halls
Orientalist Blue and Pink halls on the second floor carry ceiling and wall decoration continuous with earlier painted traditions. Analyse finishes before cleaning or repainting.
5) Rector’s Room and Kılıçlık
The rector’s room was the minister’s office; Enver Pasha’s desk survives. The Kılıçlık hall hosted sword-girding rites; a facade model-library gift is displayed in the Doctoral Hall.
6) D’Aronco and Ayverdi
D’Aronco repaired earthquake damage after 1894; Ayverdi worked in 1950; facade and marble cleaning followed in 1998. Document which layers to keep.
7) Conservation Principles
Protect facade, court–stair scheme, decorated halls and memory objects together. Avoid office partitions and services that erase hierarchy. Restoration services apply.
8) Conclusion
Layered military-to-university heritage on the Old Palace site. More on the project page; contact us.