1) What Authenticity Means

Material, form, use, and meaning must stay evidence-based. Cleaning a facade while emptying liturgical order half-destroys authenticity. Modern comfort is possible if reversible and documented.

2) Evidence Chain

Survey, damage maps, stratigraphy, analysis, and archives precede design. Layered repairs need written keep/distinguish decisions; restitution drawings are not automatic building licences.

3) Minimum Intervention

Order: structure → roof/moisture → stabilise → clean → local repair → evidence-based completion. Lime systems and test panels beat cement “quick fixes.”

4) Liturgical Relationships

Axes, apse, altars, and processional routes are architectural liturgy. Fit-out must not turn them into a flexible hall; place AV/HVAC off the sacred focus.

5) Distinguishability

New work should be honest at close view. Conjectural pattern or colour without evidence fails authenticity tests.

6) Material Decisions

Stone, plaster, paint, timber each need protocols. Fix moisture sources before consolidating surfaces; later additions may still hold historic value.

7) Board, Community, Monitoring

Board, technicians, and congregation share transparent minutes. Post-works monitoring and user rules keep authenticity alive.

8) Conclusion

Authenticity is built by evidence and restraint. Contact our restoration and consultancy teams.