1) Location and Foundation

On Beyoğlu's Kemeraltı axis near Galata–Karaköy, the church was built with community donations after permissions under Mahmud II. It remains an active place of worship and social centre. See our project page and the Armenian–Greek heritage guide.

2) Basilica Plan

A domed basilica with vaults and half-domes inside and a flatter outer roof; columnar entrance facing Kuyu Street recalls a classical temple front. Survey must record pier–arch relationships and the apse geometry before intervention.

3) Altars and Iconography

Five altars include a Marian shrine linked to a 25 March procession during a plague outbreak; Mahmud II later gifted a diamond-set silver pin. Liturgical routes and icon positions must not be museumised away from living use.

4) Hospital Chapel

The Surp Pırgiç hospital chapel, first timber-built under Harutyun Amira Bezciyan and opened in 1834, was renewed in 1906, maintained in 1966 with a gallery added, and thoroughly repaired in 2005. Layered repairs require clear documentation of which phases to keep.

5) Courtyard Memory

Gulbenkian family graves in the courtyard mark the site as remembrance space as well as worship. Drainage, stone conservation, and careful lighting protect both fabric and dignity.

6) Conservation Approach

Priority order: structural safety, moisture and roof control, surface consolidation, then fine finishes—timed around worship. Prefer lime-based mortars and reversible cleaning; avoid conjectural reconstruction.

7) Living Heritage Today

The church and foundation sustain worship, culture, and solidarity. Regular monitoring of roof, joints, moisture, and cracks reduces the need for emergency cycles.

8) Conclusion

Surp Pırgiç embodies Armenian Catholic community heritage in Istanbul. For restoration advice, contact us via our restoration team.